2019 - March - Minor Issues Outstanding |
2019 - February - Rear Wall Complete
| ![]() | ![]() | ![]() | ![]() | ![]() |
![]() The opposite, external wall in the master bedroom - similar, more extreme splitting of the wallpaper. Plaster underneath excavated revealing brick infill. |
2019 - January - Rear Wall Complete
| ![]() The rear interior. View of the oriel windows. | ![]() The rear interior. The staircase to nowhere is nowhere to be seen! | ![]() The rebuilt oriel window is back in, complete with its lead flashing. | ![]() The completed rear of the property - View from the left. | ![]() The completed rear of the property - View from the right. |
![]() The lamps are now installed and working! |
![]() Cracking in the end wall, showing the filled-in gaps in the brick infill. |
![]() The long diagonal beam is probably a modern repair to the rear. |
2018 - December - Rear Wall Rebuilding
| ![]() Shows the repair to the corner post, and the new sole plate, bressummer, studs and rebuilt plinth. | ![]() Repairs to the corner post and the 'return' to the long side wall. Some old wood used to re-house the small window, but otherwise green oak. | ![]() The rear of the house, complete bar the items noted above. | ![]() Shows the similarities between the Tudor lath-and-plaster (which was overlain with a thin layer of brick), and the modern equivalent (which isn't). | ![]() Close-up showing the gap awaiting the rebuilt oriel window. |
2018 - December - The Front Façade
| ![]() The finished front façade. Somewhat plain as the faux beams cannot be painted on with lime-wash. |
2018 - November - Rear Wall Rebuilding
| ![]() Sole plate yet to be bedded-in. Corner post repair awaiting installation. | ![]() Right-hand-side back wall and return complete bar a second coat of lime plaster. | ![]() Repairs to the supporting studs for the stair well going up to the attic. Cupboard under the stairs. | ![]() Work starts on the right-hand side of the back wall now the corner post is secure. | ![]() Compare & contrast Tudor and replacement laths. Note corner-post & bressummer joints. |
![]() The base of the rear corner - soon to be demolished - after the 'staircase to nowhere' had been removed. | ![]() The corner after removal of the 'staircase to nowhere'. |
2018 - October - Front Wall Developments
| ![]() The original 'failed' corner (and much else) after lath-and-plastering. | ![]() The front wall after a first coat of plaster. The tiling is still outstanding on the right. | ![]() The new font wall viewed from the left. The left tiling is complete. | ![]() The Bakers Gang: Gary, X, Keith, Y, Greg, Leslie, Morgan. | ![]() The right-hand 'return' after lath-and-plastering. Plinth restored. |
![]() The right-hand 'return' half completed. An old floor-joist and the bedroom-cupboard doors visible. |
2018 - September - Rebuilding the Front
| ![]() The rebuilt frame of the front. Windows missing! | ![]() The frame in the process of construction - the gable is in progress. | ![]() Close-up of the rebuilt frame below the gable. | ![]() The ground-floor window, which was sound and was re-inserted in due course, after a couple of months lying on the lawn. |
![]() | ![]() | ![]() | ![]() | ![]() |
![]() | ![]() | ![]() | ![]() | ![]() |
![]() | ![]() | ![]() | ![]() | ![]() |
![]() | ![]() | ![]() |
2018 - June - Further Investigations
| ![]() Shows the infill / wall after removal of the render at the front. Shows that the faux beams painted on at the front do follow the frame below gable level. | ![]() Shows the infill / wall after removal of the render at the side 'return'. The vertical faux beams painted follow the frame but the diagonal "beam" doesn't. | ![]() Shows how the bedroom floor-joists are supported partly by the brick infill and partly by decaying cross-beams. The diagonal beams in particular now compromise the stability of the structure. | ![]() Wider view of adjacent left. | ![]() Side return showing some weakened infill to the left, and a large hunk that seems to have fallen off the front façade following removal of the render. |
![]() | ![]() | ![]() | ![]() | ![]() |
![]() | ![]() | ![]() | ![]() | ![]() |
![]() | ![]() | ![]() | ![]() | ![]() |
![]() | ![]() |
![]() | ![]() | ![]() | ![]() | ![]() |
![]() | ![]() | ![]() | ![]() |
2018 - March - Beast from the East
| ![]() | ![]() | ![]() | ![]() | ![]() |
![]() |
Date | Length | Title |
05/04/2019 10:36:29 | 107684 | Coxes Farm (Repairs) |
02/02/2019 17:02:24 | 75333 | Coxes Farm (Repairs) |
30/01/2019 00:25:55 | 70929 | Coxes Farm (Repairs) |
13/01/2019 22:52:19 | 40574 | Coxes Farm (Repairs) |
13/01/2019 21:47:31 | 44767 | Coxes Farm (Full List) |
13/01/2019 11:05:17 | 26913 | Coxes Farm (Full List) |
13/01/2019 09:47:31 | 23327 | Coxes Farm (Full List) |
Note last updated | Reference for this Topic | Parent Topic |
---|---|---|
04/04/2020 00:14:24 | 1278 (Coxes Farm (Repairs)) | Theo Todman's Blog |
Coxes Farm (Gardens) | Coxes Farm (Pre-Repairs) | Tottering Towers & Listing Buildings |
To access information, click on one of the links in the table above.
To access information, click on one of the links in the table above.
Author | Title | Medium | Extra Links | Read? |
Todman (Theo) | Henry | Paper ![]() |
Yes | |
Todman (Theo) | Tottering Towers & Listing Buildings | Paper ![]() |
2, 3, 4, 5, 6, 7, 8, 9, 10 | Yes |
© Theo Todman, June 2007 - Sept 2023. | Please address any comments on this page to theo@theotodman.com. | File output: Website Maintenance Dashboard | Return to Top of this Page | Return to Theo Todman's Philosophy Page | Return to Theo Todman's Home Page |